EN | FA
Azin Pash Logo

Project Specifications

  • Title: Design and commissioning of paint circulation mixing system
  • Client: Iran Khodro
  • Year: 2000
  • Location: Paint Shop No. 3

Project Scope & Category

  • Scope: Paint Line
  • Project Type: Circulation / Spraying
  • Services: Design, manufacturing, installation, commissioning

Process & Automation

  • Media: Paint
  • Automation Level: Semi-automatic
  • Additional Scope: Transfer / Piping

Key Equipment & Notes

Pump Mixer Tank Manifold Regulator

Integrated paint circulation routing and reduced production line downtime through optimized circulation system design.

Contact us
for inquiries.